Chapter 6
Re farming, Spectrum trading, M&A and Surrender
Re farming of spectrum
(xxvii) What approach should be adopted to expedite the re farming of
1800 MHz and IMT 2000 spectrum from existing users?
(xxviii) What approach should be adopted for re farming of spectrum after
expiry of license?
Surrender of spectrum
(xxix) Should there be any refund for spectrum surrender in principle?
(xxx) Should there be refund for spectrum surrender consequent to
Unified Access license policy? If yes, what should be the basis?
(xxxi) How should the amount of refund be estimated?
Spectrum trading
(xxxii) Should we open up the spectrum market for spectrum trading? If
yes, what should be the time frame for doing so?
(xxxiii) What are the pre requisites to adopting spectrum trading?
Mergers & Acquisitions
(xxxiv) Whether we should specify a cap higher than 2 X 15 MHz for
Metros and Category A service area and 2 X 12.4 MHz for
Category B and C service area in case of M&As or should it be
retained?
(xxxv) In case, IMT 2000 is considered as a continuum of 2G Services, is
there a need to have a cap higher than that without IMT 2000
services? Should there be individual caps on 2G and 3G spectrum
or a combined cap?
(xxxvi) In case of M&As where the merged entity gets spectrum exceeding
the spectrum cap, what should be the time frame in which the
service provider be required to surrender the additional spectrum?
81
<
New Page 1
Web Hosting India