5.1
GENERAL
5.1.1
The standard documentation used with these Safety Rules and Procedures
is described in this Section.
5.2
SAFETY METHOD STATEMENTS
5.2.1
A Safety Method Statement is to be prepared by the Authorised Person or
by a nominated representative of the Contractor / Company / Agency
whose employees are to carry out the confined space work.
5.2.2
Where the Safety Method Statement is prepared by a Contractor /
Company / Agency, it is to be checked, approved and countersigned by the
Authorised Person before the issue of any Permit to Work.
5.2.3
Where the Authorised Person prepares a Safety Method Statement for
high risk situations it is to be checked, approved and countersigned by a
second Authorised Person or Authorising Engineer.
5.2.4
The Safety Method Statement is to indicate:
n
a description of the confined space
n
precise site details and access
n
the work to be carried out
n
plant and equipment to be taken out of service (where applicable)
n
the results of the risk assessment
n
arrangements for isolation from gases, liquids and flowing materials
(if applicable)
n
arrangements for isolation from mechanical and electrical equipment
(if applicable)
n
minimum number of personnel in the Work Team and competencies
required including any specialist training requirements
n
any special PPE, RPE or other equipment
n
methods of ventilation, cleaning, purging and inerting (if applicable)